the management and engineering activity
consisting of the cohesive collection of all
tasks
that are primarily performed to connect together components to produce a working
system or
application
Integration typically involves the following producers performing the following integration tasks in an iterative,
incremental, parallel and time-boxed manner:
An iterative, incremental, parallel development cycle
uses continuous integration during the endeavor rather than a
single big-bang integration effort at the end of the construction phase.
This activity is documented using the typical
configuration for large projects. It is intended to be
configured (i.e., instantiated, extended, and tailored) to
meet the needs of specific projects.
The preconditions of this activity should be the union of
the preconditions of its constituent tasks.
The completion criteria for this activity should be the
union of the postconditions of its constituent tasks.